Elevating the User Experience with Advanced LED Display Technology at Azman Hashim Auditorium, AICB Centre of Excellence 

17th February, 2025
AICB Case Study Image 1
Project Overview:

The Azman Hashim Auditorium, located within the AICB Centre of Excellence in Malaysia, has long been recognised as a premier venue for financial institutions in Malaysia to host flagship programmes, major events, and corporate functions.

Owned by STF Resources, the facility completed a transformative upgrade in 2024, replacing its aging projector system with cutting-edge LED display technology. With a primary focus on enhancing user experience, the auditorium now features a state-of-the-art Absen LED display powered by Brompton Technology’s Tessera LED video processors, setting a new benchmark for high-quality visual displays in multifunctional spaces.

The Challenge:

The key challenge for this project was delivering exceptional colour accuracy, stability, and broadcast-quality visual performance. The LED screen, used as a versatile backdrop for high-profile live events and professional photo and video shoots, required exceptional clarity and precision to meet the demands of these applications. Furthermore, integrating the new technology with the venue’s existing infrastructure posed potential compatibility challenges, particularly with API-controlled features. Ensuring seamless operation with the Crestron-based control system while maintaining sharp, vibrant visuals for a diverse clientele was a top priority.

The Solution:

STF Resources engaged ICO Solutions as the technical advisor to specify and integrate the most suitable technologies for the project. Key aspects of the implementation included: 

  • An Absen LED screen, selected for its superior performance and compatibility with Brompton’s Tessera LED processors. 
  • 4K Tessera SX40 LED video processors ensured flawless integration with the existing systems, delivering exceptional image quality and brightness. 
  • Customised Crestron remote-control infrastructure enabled seamless operation and provided a user-friendly interface for enhanced system control. 
AICB Case Study Image 2
AICB Case Study Image 4
Brompton features used:

The project harnessed the latest capabilities of Brompton’s Tessera v3.5 software, including: 

  • API Integration: Enabled seamless connectivity with external systems for automation and customised control. 
  • Cable Redundancy: Guaranteed uninterrupted signal transmission by automatically switching to a backup cable in case of failure. 
  • sACN Brightness Control: Allowed precise control over LED brightness, ensuring consistent image quality under varying lighting conditions. 
Technical challenges:

One of the primary technical challenges was ensuring compatibility between the new LED system and the existing Crestron-based control infrastructure. Initial integration issues with API-controlled features were successfully resolved during the design phase through custom solutions. These adjustments ensured optimal functionality and smooth interaction between systems.

Outcome:

The installation of the Brompton-powered LED display has completely transformed the audiovisual experience at the Azman Hashim Auditorium. The vibrant, sharp visuals delivered by the LED display panels, paired with the powerful processing capabilities of the Tessera SX40, have significantly enhanced the venue’s ability to host high-quality events.

While the auditorium has yet to host external users, early feedback from internal stakeholders has been overwhelmingly positive. Equipped with one of the most advanced display systems in the region, the venue is now positioned for continued success.

AICB Case Study Image 3
The recent upgrade to the LED display system at the Azman Hashim Auditorium has significantly elevated the visual experience for our events. The system’s ability to deliver vibrant, sharp, and broadcast-quality visuals has exceeded our expectations. The Brompton Tessera LED processor has played a pivotal role in achieving the superior quality we aspired to, enhancing the impact of our events and leaving a lasting impression on our clients. As the Project Manager for this project, I am proud to have led a team that delivered such an outstanding result.
Ir. Kamal Dzulkhairis, Manager, Property Management, STF Resources

    CONTACT FORM





    By submittingBy submitting this form you agree to our Terms and Privacy Policy

    Please tick here to confirm that you would like to hear from us and we will add your details to our mailing list. We never pass on your details to any third party.
    EmailPhone

    Brompton Technology
    Brompton Technology Ltd
    272 Gunnersbury Avenue
    Chiswick, London W4 5QB